Amway
Center
FACT
SHEET
Opened: October 2010
Cost: $380 million (total
construction cost)
Location: Downtown Orlando; bound by
Church Street (north); Hughey Avenue (east); South Street (south);
Division Avenue (west)
Owner and Operator: City of Orlando
Primary Tenant: Orlando Magic
Functions: NBA and collegiate
basketball, arena football, indoor soccer, concerts, hockey, circuses,
stage shows and exhibitions
Design Architect: Populous (formerly
HOK Sport)
Local Architects: C.T. Hsu +
Associates; Baker Barrios Architects, Inc.
Construction Manager: Hunt
Construction Group in association with Rey Group, R.L. Burns, Inc., HZ
Construction and Albu & Associates, Inc.
Program Manager: Turner Construction
Company
Theming and Environmental Graphics
Designer: RipBang
“Champion of the Community” Founding
Building Partners: Harris Corporation; AirTran; PepsiCo; GEICO;
Disney Parks; Florida Hospital
Site Acreage: 8.75 acres
Number of Levels: 8: Event Level (E);
Mezzanine (Level 1); IOA Founders (2); Terrace (3); Club (4); Promenade
(5); Sky (6); Press (7)
Square Footage: 875,000 square feet
Seating Capacities: 19,700 (center
stage concert)
16,000 (end stage concerts)
18,500 (NBA)
20,000 (NCAA basketball)
17,200 (hockey/arena football)
Premium Spaces: 60 private suites; 2
bunker suites; 2 super suites; 1,400 club seats; 68 loge boxes (328
seats); and overall 17 hospitality areas available on a per event basis.
Sustainable Design: Anticipated LEED Certified: Sustainable building
design will exist in various categories, including a sustainable site;
water efficiency; energy optimization and atmosphere protection;
materials and resource conservation; indoor environmental quality and
health; and environmentally preferred operations and maintenance.
Technology: Harris Corporation is the
official technology partner for the Amway Center. The arena will have
more than 1,100 screens of high-definition content via Internet Protocol
Television and a state-of-the-art digital signage network which will
maximize fan engagement and interaction, distribute an unprecedented
amount of patron information, as well as providing unlimited
opportunities for advertisers and sponsors.
MWBE Participation: Commitment to
Blueprint; Achieved in excess of 30 percent MWBE participation, above
the benchmark goal of 24 percent.
Amenities: The new Amway Center will
feature more value than ever before for ticket holders. All patron price
levels will have access to premium amenities in the Amway Center such
as:
-
Budweiser Baseline Bar and
Food Court
-
Jernigan's Restaurant
-
Nutrilite Magic Fan
Experience and Orlando on Demand Info. Garden
-
STUFF’s Magic Castle
presented by Club Wyndham
-
Coors Light Mountain Bar;
Gentleman Jack Terrace; Ozone Bar; Sky Bar
-
Outdoor plaza and covered
box office
-
Retail stores and novelty
stands
-
Multiple, wider concourses
with convenient access to concession stands and restrooms
-
Improved sightlines for all
locations and wider seats
-
Unmatched technology,
featuring 1,100 digital monitors and the tallest, high definition
video board in an NBA arena
-
Accessible seating in all
seating levels and for all seating products
-
Parking: 11,000 parking
spaces available to the public within 14 garages and
surface lots near the Amway Center. There are: 5,000 spaces less than a
five minute walk, of which 2,100 are directly adjacent; 2,500 spaces
between a 5-10 minute walk and 3,400 spaces via Lymmo, the downtown
circulator; All parking locations will have accessible parking
|